Foundation/Basement Walls

Posted By admin on May 20, 2009

Here are a couple shots of the footer after the concrete was poured into the forms:

The footer concrete was poured on Saturday!

The footer concrete was poured on Saturday!

Another footer shot

Another footer shot

After that dried, the foundation contractors came back and built the forms to pour the concrete basement walls. That was poured on Tuesday. They sure are fast and efficient. We are almost done with the foundation … just need to waterproof it all and then backfill and add a perimeter drain. Then we are on to utility work/excavation for the underground sewer and water lines. Here are some shots of the basement walls:

The forms for the basement walls

The forms for the basement walls

shot from the back looking to the front street

shot from the back looking to the front street

Side angle that shows the below grade counterfort

Side angle that shows the below grade counterfort

Share and Enjoy:
  • Digg
  • Sphinn
  • del.icio.us
  • Facebook
  • Mixx
  • Google

Comments

Leave a Reply

Please note: Comment moderation is currently enabled so there will be a delay between when you post your comment and when it shows up. Patience is a virtue; there is no need to re-submit your comment.

Captcha
Enter the letters you see above.